Tank Assembly Manipulator for Corrugated Tanks

Tank Assembly Manipulator for Corrugated Tanks
Product Detailed
Related Categories:Other Machine Tools

1. General Description of Tank Assembly Manipulator for Corrugated Tanks
   
This Manipulator is designed for fast and easy assembly of the top frame, tank bottom 
and the four corrugated panels to make a complete tank.

2. Features of Tank Assembly Manipulator for Corrugated Tanks

  1) The base frame is made from steel construction.  

  2) The hydraulic expanding head can easily be adjusted for different tank sizes and the 
clamps for top frame and tank bottom are included.  

  3) A small hydraulic power pack is mounted at the rear. 

  4) The clamp arms for the different tank sizes are exchangeable and clamped hydraulically. 
4 sets are included to cover the complete tank range. The four front clamping arms form the 
fixed datum point, whilst the rear ones are adjusted according to the tank height by means of 
a measuring tape.

 

3. Tank Inside Dimensions

  Tank inside dimensions are:

  Min (W) 285mm to 900 mm  

  Max (L) 600mm x 1500mm. 

 

4. Operation of Tank Assembly Manipulator for Corrugated Tanks

  1) In order to move the tank into the desired working position, the manipulator can be 
rotated around the axis by 360 degree by means of a rotary gear electric motor and can be 
locked in the desired position.

  2) Operator push buttons are conveniently mounted in a small box connected by flexible
-cable.

  3) The Tank can be tack welded using MIG welding torch. It is recommended having tack
 welded the tank to finish weld all seams while the tank is still on the manipulator.

  4) The Setting up of frame, bottom and corrugated panels are carried out using a pillar crane
 and the factory crane is used to remove the finished welded tank. 

  5) Removal of the finished welded tank is done by the factory crane; setting up of frame,
bottom and corrugated walls is done via jib crane.